Category - Infrastructure

17
Mar

Parking lot De Weever School

Parking lot De Weever School Within the program "Upgrading public schools phase 2B", the parking facilities of the Genevieve de Weever school were upgraded and expanded.A special school bus lane was created. Client: Ministry of Education, Culture , Sport & Youth Affairs Design and Coordination: Pream Architects Construction Period: 2013 Project Duration: 3 months Project ...
17
Mar

Bishop Hill Roundabout

Bishop Hill Roundabout For the Government of Sint Maarten, Windward Roads constructed the roundabout in the district of Dutch Quarter/ Belvedere near the French border. A large concrete culvert was constructed underneath the roundabout. Part of the scope of the works was also the asphalt resurfacing of the Bishop Hill road. Furthermore various storm water ...
17
Mar

Juancho E. Yrausquin Airport Saba

Juancho E. Yrausquin Airport Saba The Saba airport has the shortest commercial runway in the world with only 396 m1 runway. Windward Roads executed the overlay and various upgradings to this airport in the 90's. Client: Island Territory of Saba Design & Coordination: Grabowsky & Poort Construction Period: 1997-1998 Project Duration: 5 months
17
Mar

Rolandus Channel

Rolandus Channel To improve the water discharge from the Great Salt Pond and to protect Philipsburg against flooding during the hurricane season the Rolandus Channel was widened and hard-surfaced. The channel entails a four meter wide concrete floor with concrete walls of average two meter high. The channel starts at the pump house of the ...
17
Mar

Beautification Roundabout Airport

Beautification Roundabout Airport Windward Roads was contracted by the PJIAE NV for the renovation and beautification of the roundabout near the airport of Sint Maarten. Concrete round walls were erected on different levels and paver works was put into place. At completion three large bronze pelican statues, the islands national bird, were installed. Landscaping was ...
17
Mar

Civil Works for Marina Oyster Bay

Civil works for Marina Oyster Bay To create access to the new marina and to facilitate parking, a concrete road with parking and a roundabout were constructed at the lower level of the Oyster Bay Beach Resort.The project entailed demolition works, ground works, drainage works, concrete and paver works. Part of the scope of works ...
17
Mar

Breakwater Bridge

Breakwater Bridge For the Government of Sint Maarten Windward Roads realized the Design & Build project "Breakwater Bridge". To improve the drain capacity of the Fresh Pond in case of heavy rainfall, the channel between the Fresh Pond and the sea had to be widened this together with the renewal of the existing bridge. The ...
17
Mar

Cruyff Courts Sint Maarten / Sint Eustatius / Saba

Cruyff Courts Sint Maarten Sint Eustatius Saba Windward Roads realized in close cooperation with his client the installation and maintenance of all three Cruyff Courts on the Windward Islands. All courts are based on the world wide used concept of the ( Johan ) Cruyff Foundation to encourage sports and in particular soccer. Artificial grass, ...
17
Mar

Osborne (Midas) Roundabout

Osborne (Midas) Roundabout The Osborne Roundabout, was created to improve the traffic coming from the Philipsburg direction at the intersection towards the airport and the Colebay area/French side. An existing building was demolished in order to allocate the new roundabout. Although a part of the project could be executed alongside the existing roundabout roads, temporary ...
17
Mar

Tourist Corridor

Tourist Corridor In 2005 Windward Roads started the Design and Build project for the beautification and upgrading of the main roads coming from the port of Sint Maarten. The project entailed the construction of a round about including its beautification and the upgrade of the W. G. Buncamper road. Client: Government of Sint Maarten Financed ...
17
Mar

Gas Station Belvedere

Gas Station Belvedere Gas Station Belvedere is strategically located near the roundabout Bishop Hill, just between Belvedere and Dutch Quarter. Windward Roads realized the construction of the gasstation and the complete infrastructure. Client: AQG N.V. Design: Independent Consulting Engineers N.V. Coordination: Hismar N.V. Construction Period: 2010-2011 Project Duration: 7 months Project Facts: 200 m2 office ...
17
Mar

Rehabilitation Runway 10 – 28 Princess Juliana International Airport

Rehabilitation Runway 10 – 28 Princess Juliana International Airport After a life span of about 15 years, the runway of the Sint Maarten International Airport had to be resurfaced. Works entailed the re-installment of approximately 44.000 tons of asphalt, the installation of new Airport Ground Lighting (AGL) and the installation of new pavement marking. Included ...
17
Mar

Infrastructural works on the Island Territory of Saba

Infrastructural works on the Island Territory of Saba Funded by the 9th EDF, Windward Roads executed the infrastructure in the "Under the Hill" area. This project entailed the excavation and road construction on a steep hillside. Retaining walls in traditional rock work were build together with foundations and cisterns for the future housing project. The ...
17
Mar

Philipsburg Boardwalk Phase 1 & 2

Philipsburg Boardwalk Phase 1 & 2 Windward Roads realized in 2003 and 2005 the construction of the boardwalk along the Great Bay in Philipsburg. This Design & Build project included the installation of sheet piles with caping beam along the beach side and the instalation of colored concrete pavement. Various alleys were upgraded within the ...
17
Mar

Simpson Bay Causeway (Bridge over the Lagoon)

Simpson Bay Causeway The Causeway is a new bridge over the Simpson Bay Lagoon. The new bridge provides an improved traffic flow from the Princess Juliana International Airport towards the large residential area Cole Bay and the French side of the Island. Windward Roads worked in partnership with Volker Stevin Caribbean for this project. Windward ...