Civil Works for Marina Oyster Bay

17
Mar
Civil works for Marina Oyster Bay
To create access to the new marina and to facilitate parking, a concrete road with parking and a roundabout were constructed at the lower level of the Oyster Bay Beach Resort.
The project entailed demolition works, ground works, drainage works, concrete and paver works.
Part of the scope of works was the construction of a large foundation for a new waste water treatment plant.

Client:
Oyster Bay Beach Resort

Design:
IXI design N.V.

Construction Period:
2013-2014

Project Duration:
3 months